What to establish before acting

Make each meter traceable to a legal customer, utility, tariff, supplier, contract, usage history, notice date, and internal owner. Include inactive, newly acquired, landlord-billed, and shared locations so gaps are visible. Standardize proposal inputs and cost categories while retaining local rules. Aligning dates can simplify administration, but any bridge term or early exit has its own economics. Require site-level allocation and implementation status even if reporting is consolidated.

Illustrative decision boundary

An illustrative company has six stable stores, two uncertain leases, and two bundled-utility locations. Pricing all ten as one competitive three-year switch would hide different risks. Separate the procurement paths, then combine documented budgets and evidence at portfolio level.

Documents for a useful review

  • Current meter register with contracts, entities, tariffs, usage, and deadlines.
  • Documented cohort rationale and account-level offer allocation.
  • Accepted dates, first bills, changes, exceptions, and responsible contacts.

Questions & answers

Must every site share a renewal date?

No. Alignment can help, but the transition may create costs or mismatch. Compare the value of simpler administration with bridge terms, fees, and operational flexibility.

Can one agreement cover several legal entities?

Possibly under the proposed structure, but entity schedules, authority, credit, and liability need review. Do not assume a familiar brand name creates one contracting customer.

How should new and closing sites be handled?

Use written addition, removal, relocation, assignment, or settlement provisions. Keep notice proof and supplier confirmation, and update the meter register rather than simply delete the location.

Can I report one portfolio savings percentage?

Only with a defined baseline and consistent scope. Separate supply changes, efficiency, demand management, and sites that could not switch so the percentage does not overstate what occurred.

What is the best completion measure?

Track accepted enrollment and verified billing per meter, then maintain ongoing exceptions and notices. A signed master document or one accepted site is insufficient evidence for the whole portfolio.